Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Samsonbahn

Line
Line

General information  
Place Mariapfarr 
resort Fanningberg 
Region Salzburg 
Country   
Name of lift Samsonbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1995 
Commissioning date 1995 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1497 m
Height of mountain station 2017 m
Vertical rise 520 m
Route distance 2110,96 m
Horizontal length ?? m
Average incline ?? %
Largest incline 50,40 %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2389 Pers/h
Travel time 7,1 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system Siemens 
Power control system Siemens 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DT 106 
Cab manufacturer Doppelmayr 
Cab model 6E95 
Bubble colour neutral 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 99 Stk
Cab distance 45,2 m
Cab interval 9,04 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12/08/23
PHOTOS: ??

Lift-Statistics
10649 visit(s) since 02/09/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 158
Place-ID: 487

https://www.seilbahntechnik.net/en/lifts/158/datas.htm