Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGD Hintertuxer Gletscherbahn 1

Line
Line

gondola
gondola

Mountain station
Mountain station

General information  
Place Hintertux 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Hintertuxer Gletscherbahn 1 
Type 4-MGD 
Lift manufacturer Girak 
Year of construction 1973/86 
Commissioning date ?? 
Date of closing down 2008 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
1986 - Conversion from Müller clamp to Girak clamp, new cabs, scrapped after dismantling

geometric data  
Height of valley station 1597 m
Height of mountain station 2032 m
Vertical rise 435 m
Route distance 1385 m
Horizontal length ?? m
Average incline 42,60 %
Largest incline 92,60 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1750 Pers/h
Travel time 5,7 min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model OMEGA 4s 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ?? 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/07/23
PHOTOS: ??

Lift-Statistics
16047 visit(s) since 10/08/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 3026
Place-ID: 20

https://www.seilbahntechnik.net/en/lifts/3026/datas.htm