Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Glattjochbahn

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Brand 
resort Brandnertal 
Region Vorarlberg 
Country   
Name of lift Glattjochbahn 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1999 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1601 m
Height of mountain station 1976 m
Vertical rise 375 m
Route distance 1878 m
Horizontal length ?? m
Average incline 20,40 %
Largest incline 29,20 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1999 (2400) Pers/h
Travel time 6,2 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 726 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 106 
Cab manufacturer Doppelmayr 
Cab model 6E98/A 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 74 Stk
Cab distance ?? m
Cab interval ?? s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 4000 m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28/08/23
PHOTOS: ??

Lift-Statistics
14930 visit(s) since 09/09/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 83
Place-ID: 43

https://www.seilbahntechnik.net/en/lifts/83/datas.htm