Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  1-CLF Černý potok - Klínovec

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Jáchymov 
resort Klínovec ski area 
Region Karlovarský kraj 
Country   
Name of lift Černý potok - Klínovec 
Type 1-CLF 
Lift manufacturer Transporta Chrudim 
Year of construction 1965 
Commissioning date ?? 
Date of closing down 26/10/14 
Date of pull down 2020 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 802 m
Height of mountain station 1230 m
Vertical rise 428 m
Route distance 1685 m
Horizontal length 1630 m
Average incline ?? %
Largest incline ?? %
Number of pillars 25 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 234 Pers/h
Travel time 12,8 min
Driving speed line 2,2 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 54 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Transporta Chrudim 
Cab model ?? 
Seating none 
Seat heater no 
Persons per cab
Number of cabs 110 Stk
Cab distance 33 m
Cab interval 15 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 28 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/09/21
PHOTOS: ??

Lift-Statistics
13920 visit(s) since 21/11/06
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 10624
Place-ID: 356

https://www.seilbahntechnik.net/en/lifts/10624/datas.htm