Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Hochzillertalbahn III

Mountain station
Mountain station

Line
Line

Line
Line

General information  
Place Kaltenbach 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Hochzillertalbahn III 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2006 
Commissioning date 2006 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 561,08 m
Height of mountain station 1736,78 m
Vertical rise 1175,70 m
Route distance 3063 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 22 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 8,6 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 1845 kW
Drive power (Operation) 1560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Sigma 
Cab model DIAMOND - C8D210 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 112 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 59 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/06/23
PHOTOS: ??

Lift-Statistics
38201 visit(s) since 23/12/06
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 10763
Place-ID: 148

https://www.seilbahntechnik.net/en/lifts/10763/datas.htm