Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD Neugarten 8er Carving-Jet










General information  
Place Annenheim 
resort Gerlitzen 
Region Carinthia 
Country   
Name of lift Neugarten 8er Carving-Jet 
Type 8-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2007 
Commissioning date 2007 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1620 m
Height of mountain station 1908 m
Vertical rise 288 m
Route distance 1315 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance 20 m
Trackwidth drive 690 m
Trackwidth line 730 m
Trackwidth return 710 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3400 Pers/h
Travel time 4,9 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 8E98 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 69 Stk
Cab distance 41,0 m
Cab interval 8,5 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 550 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 00 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/03/24
PHOTOS: ??

Lift-Statistics
28058 visit(s) since 04/10/07
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 12121
Place-ID: 31

https://www.seilbahntechnik.net/en/lifts/12121/datas.htm