Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD trassXpress










General information  
Place Zell am See 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift trassXpress 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2007 
Commissioning date 24/11/07 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 943 m
Height of mountain station 1901 m
Vertical rise 958 m
Route distance 2847 m
Horizontal length 2674,46 m
Average incline ?? %
Largest incline ?? %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 8,95 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA IV-8 LWI 
Seating leather 
Seat heater yes 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 89 Stk
Cab distance ?? m
Cab interval 12 s
Garage type ground floor 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 15 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/08/22
PHOTOS: ??

Lift-Statistics
25461 visit(s) since 18/11/07
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 12176
Place-ID: 252

https://www.seilbahntechnik.net/en/lifts/12176/datas.htm