Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Riedli - Nüegg

Mountain Station
Mountain Station

Valley Station
Valley Station

Line
Line

General information  
Place Diemtigen 
resort Springenboden 
Region Berne 
Country   
Name of lift Riedli - Nüegg 
Type 6-CLD 
Lift manufacturer Garaventa 
Year of construction 2007 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1001,5 m
Height of mountain station 1419,80 m
Vertical rise 418,25 m
Route distance 1403 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000  Pers/h
Travel time 5,5 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system Frey 
Power control system Frey 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 420 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Garaventa 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 47  Stk
Cab distance 54 m
Cab interval ?? s
Garage type station circulation 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance 90° 
Situation of exit ?? 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/04/23
PHOTOS: ??

Lift-Statistics
7747 visit(s) since 15/01/08
Last visit 16/04/24

LIFT-WORLD IDs
Lift-ID: 12428
Place-ID: 2121

https://www.seilbahntechnik.net/en/lifts/12428/datas.htm