Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Burgstallalmlift

Line
Line

Valley Station
Valley Station

Valley Station
Valley Station

General information  
Place Schladming 
resort ?? 
Region Styria 
Country   
Name of lift Burgstallalmlift 
Type 4-CLF 
Lift manufacturer Girak 
Year of construction 1990/94 
Commissioning date 1990 
Date of closing down 2016 
Date of pull down 2016 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1572 m
Height of middle station(s) ?? m
Height of mountain station 1908 m
Vertical rise 336 m
Route distance 1035 m
Horizontal length ?? m
Average incline 29,10 %
Largest incline 34,20 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 7,2 min
Driving speed line 2,4 m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 232 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Girak 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 122 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 24/01/24
PHOTOS: ??

Lift-Statistics
23471 visit(s) since 18/01/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 1491
Place-ID: 240

https://www.seilbahntechnik.net/en/lifts/1491/datas.htm