Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Sinalcobahn (Hintermoosbahn)










General information  
Place Maria Alm 
resort ?? 
Region Salzburg 
Country   
Name of lift Sinalcobahn (Hintermoosbahn) 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2010 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 896 m
Height of mountain station 1631 m
Vertical rise 735 m
Route distance 3520 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return 5,2 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 10,8 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system Siemens 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 705 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Carvatech 
Cab model ULTRA 8 S 
Seating leather 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 80 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 11 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/03/24
PHOTOS: ??

Lift-Statistics
27378 visit(s) since 23/10/10
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 14934
Place-ID: 234

https://www.seilbahntechnik.net/en/lifts/14934/datas.htm