Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  200-FUC People Mover










General information  
Place Venice 
resort ?? 
Region Veneto 
Country   
Name of lift People Mover 
Type 200-FUC 
Lift manufacturer Doppelmayr 
Year of construction 2010 
Commissioning date 2010 


Infos for handicapped persons
at every station is an elevator and an escalator

Characteristics
nothing

geometric data  
Height of valley station 5 m
Height of middle station(s) 8 m
Height of mountain station 7 m
Vertical rise 2 m
Route distance 820 m
Horizontal length 820 m
Average incline ?? %
Largest incline ?? %
Trackwidth drive ?? m
Trackwidth line 820 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 4 min
Driving speed line 8,0 m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system Siemens 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive electrical 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater yes 
Aircon yes 
Persons per cab 200 
Number of cabs 8 Stk
Carriage Operator no 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 1800 m
Length of counter-rope ?? m
Total weight of haul rope 10 t
Total weight of counter-rope ?? t
Haul rope diameter 42 mm
Counter-rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope Valley station 
Tension type electrical 
Tension way 3 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Type of turnout ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/02/23
PHOTOS: ??

Lift-Statistics
12024 visit(s) since 11/10/11
Last visit 26/03/24

LIFT-WORLD IDs
Lift-ID: 15450
Place-ID: 1653

https://www.seilbahntechnik.net/en/lifts/15450/datas.htm