Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Loferer Almbahn I










General information  
Place Lofer 
resort ?? 
Region Salzburg 
Country   
Name of lift Loferer Almbahn I 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2011 
Commissioning date ?? 


Infos for handicapped persons
no steps

Characteristics
nothing

geometric data  
Height of valley station 632 m
Height of mountain station 1000 m
Vertical rise 371 m
Route distance 1920 m
Horizontal length 1884 m
Average incline 19 %
Largest incline 36 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 (2400) Pers/h
Travel time 6 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 574 (697) kW
Drive power (Operation) 445 (549) kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA IV-8 LWI 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 42 (63) Stk
Cab distance 107,34 m
Cab interval 17,89  s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/12/23
PHOTOS: ??

Lift-Statistics
17585 visit(s) since 23/11/11
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 15483
Place-ID: 217

https://www.seilbahntechnik.net/en/lifts/15483/datas.htm