Lift-Database » Lifts in the world

  4-CLD/B Pengelstein 2







Rescue bridge
Rescue bridge

General information  
Place Kirchberg 
resort ?? 
Region Tyrol 
Country   
Name of lift Pengelstein 2 
Type 4-CLD/B 
Lift manufacturer Girak-Garaventa 
Year of construction 2000 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1319 m
Height of mountain station 1934 m
Vertical rise 565 m
Route distance 2171 m
Horizontal length ?? m
Average incline 27,10 %
Largest incline 54,70 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2040 Pers/h
Travel time 7,1 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 716 kW
Drive power (Operation) 573 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Girak-Garaventa 
Cab model ?? 
Bubble colour ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 129 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 3 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) D2 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/10/23
PHOTOS: ??

Lift-Statistics
27466 visit(s) since 22/11/02
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 1566
Place-ID: 55

https://www.seilbahntechnik.net/en/lifts/1566/datas.htm