Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Panoramabahn

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Jerzens 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Panoramabahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2002 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
New at winter 2009/10 seat-heater

geometric data  
Height of valley station 1802 m
Height of mountain station 2370 m
Vertical rise 568 m
Route distance 1404,94 m
Horizontal length ?? m
Average incline 44,20 %
Largest incline 69,81 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2755 Pers/h
Travel time 4,79 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 829 kW
Drive power (Operation) 676 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour ?? 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 78 Stk
Cab distance ?? m
Cab interval 7,84 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/10/22
PHOTOS: ??

Lift-Statistics
16069 visit(s) since 21/01/03
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 1594
Place-ID: 139

https://www.seilbahntechnik.net/en/lifts/1594/datas.htm