Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Schermerspitzbahn

Valley station
Valley station

Line
Line

Line
Line

General information  
Place Hochgurgl 
resort Obergurgl-Hochgurgl 
Region Tyrol 
Country   
Name of lift Schermerspitzbahn 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1987 
Commissioning date 1987 
Date of closing down 2007 
Date of pull down 2007 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle station

geometric data  
Height of valley station 2420,5 m
Height of middle station(s) ?? m
Height of mountain station 2999 m
Vertical rise 579,5 m
Route distance 2178 m
Horizontal length ?? m
Average incline 27,90 %
Largest incline 62,40 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1428 Pers/h
Travel time 12 min
Driving speed line 3,0 m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model 2E Fix 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 290 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/12/23
PHOTOS: ??

Lift-Statistics
12928 visit(s) since 12/06/03
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 1791
Place-ID: 61

https://www.seilbahntechnik.net/en/lifts/1791/datas.htm