Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Arabba Fly

Mountain station
Mountain station

Valley station
Valley station

Line
Line

General information  
Place Arabba 
resort Dolomiti Superski 
Region Veneto 
Country   
Name of lift Arabba Fly 
Type 6-CLD 
Lift manufacturer Leitner 
Year of construction 2015 
Commissioning date 25/12/15 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1640 m
Height of mountain station 1670 m
Vertical rise 30 m
Route distance 424 m
Horizontal length 425,12 m
Average incline ?? %
Largest incline ?? %
Number of pillars 5 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2650 Pers/h
Travel time 1,25 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 160 kW
Drive power (Operation) 135 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating leather 
Seat heater ?? 
Persons per cab
Number of cabs 26 Stk
Cab distance 40,75 m
Cab interval 8,15 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 2,5 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet ?? 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/05/23
PHOTOS: ??

Lift-Statistics
14322 visit(s) since 04/12/15
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 18027
Place-ID: 1292

https://www.seilbahntechnik.net/en/lifts/18027/datas.htm