Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Albonabahn II

Line
Line

Line
Line

Line
Line

General information  
Place Stuben 
resort Ski Arlberg 
Region Vorarlberg 
Country   
Name of lift Albonabahn II 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2016 
Commissioning date 02/12/16 


Infos for handicapped persons
The mountain and valley stations are situated on the ground level.

Characteristics
It is together with the 10-MGD Flexenbahn the first cable car in Stuben!

geometric data  
Height of valley station 1636 m
Height of mountain station 2317 m
Vertical rise 681 m
Route distance 2171,81 m
Horizontal length 2049,8 m
Average incline 33,19 %
Largest incline 65,87 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance 81 m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 6 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 880 kW
Drive power (Operation) 675 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type A108 
Cab manufacturer CWA 
Cab model OMEGA IV-10 SI 
Seating leather 
Seat heater yes 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 48 Stk
Cab distance 127,06 m
Cab interval 21,18 s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 4417 m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 40 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/02/22
PHOTOS: ??

Lift-Statistics
21114 visit(s) since 26/11/16
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 18192
Place-ID: 565

https://www.seilbahntechnik.net/en/lifts/18192/datas.htm