Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Fleidingbahn







Valley station
Valley station

General information  
Place Westendorf 
resort SkiWelt 
Region Tyrol 
Country   
Name of lift Fleidingbahn 
Type 3-CLF 
Lift manufacturer Swoboda 
Year of construction 1983 
Commissioning date ?? 
Date of closing down 31/03/19 
Date of pull down 01/04/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
unused middle station

geometric data  
Height of valley station 1426 m
Height of middle station(s) 1600 m
Height of mountain station 1867 m
Vertical rise 441 m
Route distance 1086 m
Horizontal length ?? m
Average incline 44,50 %
Largest incline 77,20 %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1802 Pers/h
Travel time 9,1 min
Driving speed line 2,0 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Swoboda 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 193 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) 117 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/03/23
PHOTOS: ??

Lift-Statistics
23444 visit(s) since 29/10/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 1932
Place-ID: 72

https://www.seilbahntechnik.net/en/lifts/1932/datas.htm