Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Creux Noirs

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Courchevel 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Creux Noirs 
Type 3-CLF 
Lift manufacturer Poma 
Year of construction 1983 
Commissioning date 1983 
Date of closing down 2018 
Date of pull down 2019 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2301 m
Height of mountain station 2681 m
Vertical rise 380 m
Route distance 1100 m
Horizontal length ?? m
Average incline 38 %
Largest incline 84 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 7,33 min
Driving speed line 2,5 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 359 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 123 Stk
Cab distance 18 m
Cab interval 7,2 s


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? FRF
Currency (Construction costs) French franc 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 20/11/23
PHOTOS: ??

Lift-Statistics
14067 visit(s) since 08/09/04
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 1980
Place-ID: 1009

https://www.seilbahntechnik.net/en/lifts/1980/datas.htm