Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  115-FUC Metro Alpin

Waggon
Waggon

Mountain Station
Mountain Station

General information  
Place Saas-Fee 
resort ?? 
Region Valais 
Country   
Name of lift Metro Alpin 
Type 115-FUC 
Lift manufacturer Von Roll-Habegger 
Year of construction 1984 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2980 m
Height of middle station(s) ?? m
Height of mountain station 3445 m
Vertical rise 465 m
Route distance 1447 m
Horizontal length ?? m
Average incline ?? %
Largest incline 48 %
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 3,0 min
Driving speed line 10,0 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 998 kW
Drive power (Operation) 545 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Gangloff 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 115 
Number of cabs 2 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Length of counter-rope ?? m
Total weight of haul rope ?? t
Total weight of counter-rope ?? t
Haul rope diameter ?? mm
Counter-rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope ?? 
Tension type none 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period 39 months
Seasontime ❄ ☀ all-season 
Type of turnout ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/04/23
PHOTOS: ??

Lift-Statistics
18763 visit(s) since 17/05/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 2212
Place-ID: 1725

https://www.seilbahntechnik.net/en/lifts/2212/datas.htm