Lift-Database » Lifts in the world
4-CLD/B Schönbodenbahn
Leaving the Valley Station
General information | |
---|---|
Place | Axamer Lizum |
resort | Axamer Lizum |
Region | Tyrol |
Country | |
Name of lift | Schönbodenbahn |
Type | 4-CLD/B |
Lift manufacturer | Felix Wopfner |
Year of construction | 1991 |
Commissioning date | ?? |
Date of closing down | 18/04/22 |
Date of pull down | 2022 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
will be rebuilt in Luncile Prigoanei (Rumania) |
geometric data | |
---|---|
Height of valley station | 1561 m |
Height of mountain station | 2118 m |
Vertical rise | 557 m |
Route distance | 1680 m |
Horizontal length | ?? m |
Average incline | 34,8 % |
Largest incline | 64,8 % |
Number of pillars | 15 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 4,8 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1919 Pers/h |
Travel time | 5,7 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Felix Wopfner |
Cab model | ?? |
Bubble colour | ?? |
Seating | ?? |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 100 Stk |
Cab distance | 37,72 m |
Cab interval | 7,54 s |
Garage type | underground |
Garage place | valley station |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 6,5 months |
Seasontime | ❄ winter |
Situation of entrance | parallel |
Situation of exit | parallel |
Loading carpet | no |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 17/02/24
PHOTOS: ??
Lift-Statistics
19233 visit(s) since 18/11/03
Last visit 29/03/24
LIFT-WORLD IDs
Lift-ID: 2402
Place-ID: 69
https://www.seilbahntechnik.net/en/lifts/2402/datas.htm
Datas: 17/02/24
PHOTOS: ??
Lift-Statistics
19233 visit(s) since 18/11/03
Last visit 29/03/24
LIFT-WORLD IDs
Lift-ID: 2402
Place-ID: 69
https://www.seilbahntechnik.net/en/lifts/2402/datas.htm