Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF DSB Schwarzsee










General information  
Place Afritz am See 
resort ?? 
Region Carinthia 
Country   
Name of lift DSB Schwarzsee 
Type 2-CLF 
Lift manufacturer De Pretis 
Year of construction 1978 
Commissioning date 21/01/78 
Date of closing down 2012 
Date of pull down 2016 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1267 m
Height of middle station(s) 1510 m
Height of mountain station 1830 m
Vertical rise 563 m
Route distance 2015 m
Horizontal length 1922 m
Average incline 29,15 %
Largest incline 61,27 %
Number of pillars 19 Stk
Greatest spanwidth 210 m
Max ground clearance 18 m
Trackwidth drive 3,60 m
Trackwidth line 3,60 m
Trackwidth return 3,60 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 790 Pers/h
Travel time 13,43 min
Driving speed line 2,5 m/s

electrical data  
Electrical control AEG 
Remote control and telemonitoring system AEG 
Power control system AEG 
Number of drive 1 Stk
Drive power (Start) 252 kW
Drive power (Operation) 216 kW
Brake power 97 kW
Continuous brake power 77 kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive gas engine 
Traction of emergency drive mechanical 

cabins data  
Grip type ?? 
Cab manufacturer Girak 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 178 Stk
Cab distance 22,78 m
Cab interval 9,11 s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 4200 m
Total weight of haul rope 20,3 t
Haul rope diameter 36 mm
Nominal strength of haul rope 1960 N/mm²
Breaking strength of rope 1015 kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way 6 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 12 months
Seasontime ❄ ☀ all-season 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/09/22
PHOTOS: ??

Lift-Statistics
14027 visit(s) since 27/09/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 285
Place-ID: 30

https://www.seilbahntechnik.net/en/lifts/285/datas.htm