Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  1-CLF Brentenjochlift




Mountain Station
Mountain Station

Mountain Station
Mountain Station

General information  
Place Kufstein 
resort ?? 
Region Tyrol 
Country   
Name of lift Brentenjochlift 
Type 1-CLF 
Lift manufacturer Kienast 
Year of construction 1963 
Commissioning date 21/12/63 
Date of closing down 1994 
Date of pull down 1998 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Cable car crossed 130 meter deep valley.

geometric data  
Height of valley station 1240 m
Height of mountain station 1180 m
Vertical rise -60 m
Route distance 1380 m
Horizontal length 1318 m
Average incline ?? %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 300 Pers/h
Travel time ?? min
Driving speed line 1,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type diesel engine 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Wolf & Switzeny 
Cab model ?? 
Seating duckboard (timber) 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet no 
Evacuation ropeway yes 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/01/24
PHOTOS: ??

Lift-Statistics
10862 visit(s) since 19/03/05
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 309
Place-ID: 466

https://www.seilbahntechnik.net/en/lifts/309/datas.htm