Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Sonnenlift

Mountain station
Mountain station

Line
Line




General information  
Place Bruneck / Brunico 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Sonnenlift 
Type 4-CLD/B 
Lift manufacturer Leitner 
Year of construction 1995 
Commissioning date 1995 
Date of closing down 2017 
Date of pull down 2017 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2066,6 m
Height of mountain station 2273,6 m
Vertical rise 207,4 m
Route distance 701,66 m
Horizontal length 668 m
Average incline 31 %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time ?? min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 234 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 54 Stk
Cab distance 28,8 m
Cab interval 7,2 s
Garage type underground 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/02/24
PHOTOS: ??

Lift-Statistics
15848 visit(s) since 20/11/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 3616
Place-ID: 1329

https://www.seilbahntechnik.net/en/lifts/3616/datas.htm