Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Schöngampbahn

Valley station
Valley station

Valley station
Valley station

Mountain station
Mountain station

General information  
Place Fiss 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Schöngampbahn 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2002 
Commissioning date 2002 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2084 m
Height of mountain station 2496 m
Vertical rise 412 m
Route distance 1380,42 m
Horizontal length ?? m
Average incline 31,27 %
Largest incline 51,28 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3011 Pers/h
Travel time 4,72 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 644 (752) kW
Drive power (Operation) 512 (608) kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 8E98/B 
Bubble colour ?? 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 65 Stk
Cab distance 47,82 m
Cab interval 9,56 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 4 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/03/24
PHOTOS: ??

Lift-Statistics
22799 visit(s) since 09/01/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 428
Place-ID: 136

https://www.seilbahntechnik.net/en/lifts/428/datas.htm