Lift-Database » Lifts in the world

  4-CLF Schwarzlofer

Mountain Station
Mountain Station

Mountain Station
Mountain Station

Valley station
Valley station

General information  
Place Waidring 
resort 3 Laender Freizeit-Arena 
Region Tyrol 
Country   
Name of lift Schwarzlofer 
Type 4-CLF 
Lift manufacturer Leitner 
Year of construction 2000 
Commissioning date 2000 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1241 m
Height of mountain station 1453 m
Vertical rise 232,05 m
Route distance 726,69 m
Horizontal length ?? m
Average incline 34,00 %
Largest incline 80,60 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5,3 m
Trackwidth line 5,3 m
Trackwidth return 5,3 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 1800 (2000) Pers/h
Travel time 4,7 min
Driving speed line 2,6 m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system Leitner 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 204 kW
Drive power (Operation) 153 kW
Brake power -183 kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 70 (78) Stk
Cab distance 21 m
Cab interval 8,08 s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope 1770 N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/03/22
PHOTOS: ??

Lift-Statistics
15581 visit(s) since 21/11/02
Last visit 28/03/24