Lift-Database » Lifts in the world
23-AT Predigtstuhlbahn
Valley Station
Line
Mountain Station
General information | |
---|---|
Place | Bad Reichenhall |
resort | ?? |
Region | Bavaria |
Country | |
Name of lift | Predigtstuhlbahn |
Type | 23-AT |
Lift manufacturer | Bleichert |
Year of construction | 1927/28 |
Commissioning date | 01/07/28 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 476 m |
Height of mountain station | 1583 m |
Vertical rise | 1140 m |
Route distance | 2380 m |
Horizontal length | 2110 m |
Average incline | ?? % |
Largest incline | 75 % |
Number of pillars | 3 Stk |
Greatest spanwidth | 990 m |
Max ground clearance | 180 m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 125 Pers/h |
Travel time | 8,5 min |
Driving speed line | 5,0 m/s |
Speed on towers | 5,0 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 1 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 70 kW |
Brake power | 70 kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Bleichert |
Cab model | ?? |
Heater | no |
Aircon | no |
Persons per cab | 23 |
Number of cabs | 2 Stk |
Carriage Operator | yes |
rope data | |
---|---|
Rope manufacturer | WDI |
Length of carrying rope | ?? m |
Length of traction rope | ?? m |
Length of counter-rope | ?? m |
Total weight of carrying rope | 67,5 t |
Total weight of traction rope | ?? t |
Total weight of counter-rope | ?? t |
Carrying rope diameter | ?? mm |
Traction rope diameter | ?? mm |
Counter-rope diameter | ?? mm |
Nominal strength of carrying rope | ?? N/mm² |
Nominal strength of traction rope | ?? N/mm² |
Nominal strength of counter-rope | ?? N/mm² |
Breaking strength of carrying rope | ?? kN |
Breaking strength of traction rope | ?? kN |
Breaking strength of counter-rope | ?? kN |
Tensionstation carryingrope | Valley station |
Tensionstation tractionrope | Valley station |
Tension type | rope tension weight |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 12 months |
Seasontime | ❄ ☀ all-season |
xxxx hier text hin xxxx | yes |
Moving platform | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 18/02/21
PHOTOS: ??
Lift-Statistics
26007 visit(s) since 05/05/03
Last visit 29/03/24
LIFT-WORLD IDs
Lift-ID: 483
Place-ID: 269
https://www.seilbahntechnik.net/en/lifts/483/datas.htm
Datas: 18/02/21
PHOTOS: ??
Lift-Statistics
26007 visit(s) since 05/05/03
Last visit 29/03/24
LIFT-WORLD IDs
Lift-ID: 483
Place-ID: 269
https://www.seilbahntechnik.net/en/lifts/483/datas.htm