Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Kreuzjochbahn I










General information  
Place Fulpmes 
resort Schlick 2000 
Region Tyrol 
Country   
Name of lift Kreuzjochbahn I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1995 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1014 m
Height of mountain station 1350 m
Vertical rise 336 m
Route distance 878 m
Horizontal length ?? m
Average incline 43,70 %
Largest incline 68,40 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 2,93 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 410 kW
Drive power (Operation) 320 kW
Brake power -280 kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type DS 106 
Cab manufacturer CWA 
Cab model OMEGA 6s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 47 Stk
Cab distance 54 m
Cab interval 10,8 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/02/24
PHOTOS: ??

Lift-Statistics
18045 visit(s) since 27/08/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 509
Place-ID: 70

https://www.seilbahntechnik.net/en/lifts/509/datas.htm