Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Garnitzenbahn I










General information  
Place Hermagor 
resort ?? 
Region Carinthia 
Country   
Name of lift Garnitzenbahn I  
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1541 m
Height of mountain station 1878 m
Vertical rise 337 m
Route distance 1419 m
Horizontal length ?? m
Average incline ?? %
Largest incline 56,20 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2421 Pers/h
Travel time 4,85 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 530 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 68 Stk
Cab distance ?? m
Cab interval 8,92 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 4 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/08/23
PHOTOS: ??

Lift-Statistics
19745 visit(s) since 07/08/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 519
Place-ID: 193

https://www.seilbahntechnik.net/en/lifts/519/datas.htm