Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  100-AT Tiroler Zugspitzbahn



General information  
Place Ehrwald 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Tiroler Zugspitzbahn 
Type 100-AT 
Lift manufacturer Waagner Biro 
Year of construction 1991 
Commissioning date ?? 
Date of closing down 2003 
Date of pull down 2003 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1225 m
Height of middle station(s) ?? m
Height of mountain station 2950 m
Vertical rise 1725 m
Route distance 3591 m
Horizontal length ?? m
Average incline 55,00 %
Largest incline 81,00 %
Number of pillars 3 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 730 Pers/h
Travel time 7,2 min
Driving speed line 10,0 m/s
Speed on towers ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 1000 kW
Drive power (Operation) 700 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Swoboda 
Cab model ?? 
Heater ?? 
Aircon ?? 
Persons per cab 100 
Number of cabs 2 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer ?? 
Length of carrying rope ?? m
Length of traction rope ?? m
Length of counter-rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Total weight of counter-rope ?? t
Carrying rope diameter ?? mm
Traction rope diameter ?? mm
Counter-rope diameter ?? mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation carryingrope ?? 
Tensionstation tractionrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 25 months
Seasontime ❄ ☀ all-season 
xxxx hier text hin xxxx ?? 
Moving platform ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 31/12/23
PHOTOS: ??

Lift-Statistics
9826 visit(s) since 29/03/05
Last visit 18/04/24

LIFT-WORLD IDs
Lift-ID: 5868
Place-ID: 85

https://www.seilbahntechnik.net/en/lifts/5868/datas.htm