Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Steinetli - Hinterschwarzenegg

Valley station
Valley station

Valley station
Valley station

Towers for Mountain station
Towers for Mountain station

General information  
Place Flühli 
resort Soerenberg 
Region Lucerne 
Country   
Name of lift Steinetli - Hinterschwarzenegg 
Type 4-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2005 
Commissioning date 2005 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1388 m
Height of mountain station 1684 m
Vertical rise 296 m
Route distance 1582 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 5,27 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 558 kW
Drive power (Operation) 358 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 104G 
Cab manufacturer Garaventa 
Cab model 4E98/B 
Bubble colour ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 101 Stk
Cab distance 32,73 m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 3256 m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/01/18
PHOTOS: ??

Lift-Statistics
6484 visit(s) since 04/05/05
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 6136
Place-ID: 2315

https://www.seilbahntechnik.net/en/lifts/6136/datas.htm