Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Wedelexpress










General information  
Place Kaltenbach 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Wedelexpress 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date 2001 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2039 m
Height of mountain station 2377 m
Vertical rise 337 m
Route distance 1167 m
Horizontal length ?? m
Average incline 31,12 %
Largest incline 71,45 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,9 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 456 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 90 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/06/23
PHOTOS: ??

Lift-Statistics
27797 visit(s) since 15/07/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 636
Place-ID: 148

https://www.seilbahntechnik.net/en/lifts/636/datas.htm