Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  12-MGD Gipfelbahn










General information  
Place Bruneck / Brunico 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Gipfelbahn 
Type 12-MGD 
Lift manufacturer Leitner 
Year of construction 1989 
Commissioning date ?? 
Date of closing down 2010 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1726 m
Height of mountain station 2267 m
Vertical rise 541 m
Route distance 1704 m
Horizontal length 1616,24 m
Average incline ?? %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 5,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 880 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model ?? 
Seating none 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab 12 
Number of cabs 57 Stk
Cab distance 72 m
Cab interval 14,4 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period ?? months
Seasontime ??  
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/04/23
PHOTOS: ??

Lift-Statistics
16133 visit(s) since 22/05/05
Last visit 19/04/24

LIFT-WORLD IDs
Lift-ID: 6514
Place-ID: 1329

https://www.seilbahntechnik.net/en/lifts/6514/datas.htm