Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Padon 2

Valley station
Valley station

Valley station
Valley station

Mountain station
Mountain station

General information  
Place Malga Ciapèla 
resort ?? 
Region Veneto 
Country   
Name of lift Padon 2 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2004 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1688 m
Height of mountain station 2401 m
Vertical rise 713 m
Route distance 2399 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 27 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type A104C 
Cab manufacturer Doppelmayr 
Cab model 4E98/B 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 143 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28/01/24
PHOTOS: ??

Lift-Statistics
22349 visit(s) since 28/05/05
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 6773
Place-ID: 1465

https://www.seilbahntechnik.net/en/lifts/6773/datas.htm