Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Mont Rond

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Notre-Dame-de-Bellecombe 
resort Espace Diamant 
Region Rhône-Alpes 
Country   
Name of lift Mont Rond 
Type 3-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 1982 
Commissioning date 1982 
Date of closing down ?? 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1310 m
Height of middle station(s) ?? m
Height of mountain station 1767 m
Vertical rise 457 m
Route distance 2017 m
Horizontal length ?? m
Average incline 22,7 %
Largest incline 51 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 800 Pers/h
Travel time 14,62 min
Driving speed line 2,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/01/18
PHOTOS: ??

Lift-Statistics
5372 visit(s) since 07/03/06
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 8580
Place-ID: 1151

https://www.seilbahntechnik.net/en/lifts/8580/datas.htm