Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


  , Ötscher-Hochkar




4-CLD/B  Hochkar

Height of valley station: 1482 m Travel time: 4,1 min
Height of mountain station: 1773 m Driving speed line: 4,5 m/s
Route distance: 1097 m Seasontime: ❄ ☀
Year of construction: 1995 Lift manufacturer: Girak



2-SL  Sonnenlift II

Height of valley station: m Travel time: 3,5 min
Height of mountain station: m Driving speed line: 3 m/s
Route distance: 581 m Seasontime:
Year of construction: 2017 Lift manufacturer: Doppelmayr




4-CLF  Eibenkogel

Height of valley station: 812 m Travel time: 5,7 min
Height of mountain station: 1000 m Driving speed line: 2,6 m/s
Route distance: 885,18 m Seasontime:
Year of construction: 2006 Lift manufacturer: Doppelmayr



1-CLF  Hochkar

Height of valley station: m Travel time: min
Height of mountain station: m Driving speed line: m/s
Route distance: 1090 m Seasontime: ??
Year of construction: 1965 Lift manufacturer: Girak



4-CLF  Ötscher

Height of valley station: 1001 m Travel time: 7,1 min
Height of mountain station: 1416 m Driving speed line: 2,6 m/s
Route distance: 1109 m Seasontime:
Year of construction: 2004 Lift manufacturer: Doppelmayr







Places of the ski resort
  Gostling an der Ybbs
  Lackenhof





Wrong data or something is missing?
Support us!