Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


  Niederalpl



4-CLF  Niederalpl-Bahn

Height of valley station: 1210 m Travel time: 5,1 min
Height of mountain station: 1420 m Driving speed line: 2,6 m/s
Route distance: 792 m Seasontime: ??
Year of construction: 1996 Lift manufacturer: Leitner



2-SL  Sohlenalmlift

Height of valley station: ?? m Travel time: ?? min
Height of mountain station: ?? m Driving speed line: ?? m/s
Route distance: 1280 m Seasontime: ??
Year of construction: 1980 Lift manufacturer: Swoboda



1-SL  Tellerlift 2

Height of valley station: ?? m Travel time: ?? min
Height of mountain station: ?? m Driving speed line: ?? m/s
Route distance: 231 m Seasontime: ??
Year of construction: 1996 Lift manufacturer: Leitner



1-SL  Waldrand

Height of valley station: ?? m Travel time: ?? min
Height of mountain station: ?? m Driving speed line: ?? m/s
Route distance: ?? m Seasontime: ??
Year of construction: 2000 Lift manufacturer:








Schlift Ges. m. b. H. Mürzsteg Niederalp
Street / P.O. Box Mürzsteg 6
Place  A-8693 Mürzsteg
Tel +43 (0)3859 2127
Fax +43 (0)3859 2201
E-mail info@niederalpl.at
Internet http://www.snowpark.at



Places of the ski resort
  Muerzsteg


Longitude 15° 29' 34.9" (15.493)
Latitude 47° 40' 32.3" (47.676)





Wrong data or something is missing?
Support us!