Servis » Novinky
Montenegro: From sea to mountain in eleven minutes
Superlative ropeway project begins: spanning a distance of 3.9 kilometers and
1,316 vertical meters, a LEITNER system will soon connect the UNESCO World
Heritage Site of Kotor with Lovćen National Park. Montenegro’s Prime Minister
Dritan Abazovic has described the project as being “of major strategic
importance to the country’s development as a tourist destination.” Martin
Leitner also considers the new ropeway strongly indicative of the future of the
region: “Green mobility means sustainable economic growth.”
In Montenegro, work began in recent days on the first sea-to-mountain gondola lift on
the Adriatic, which the South Tyrolean company LEITNER will build and operate for
the next 30 years together with a consortium formed around local construction
enterprise Novi Volvox. The ropeway is expected to open in summer 2023.
The new route runs from Kotor to Kuk, a point on Mount Lovćen 1,348 meters above
sea level in one of Dalmatia’s most spectacular natural preserves. Gondolas will travel
the 3.9-kilometer route in less than eleven minutes.
“Our aim is to make the country even more attractive, and this project will play a major
part in making this vision a reality,” said Montenegro’s Prime Minister Dritan Abazovic
at the groundbreaking ceremony. “The ropeway will become one of the finest facilities
of its kind in Europe, and it will also be of considerable strategic importance, since it
will directly connect two of Montenegro’s most emblematic places: the UNESCO World
Heritage Site of Kotor and Lovćen National Park.”
LEITNER board member Martin Leitner concurs. “We are extremely proud – and very
aware of the responsibility it entails – to breathe genuine life into an idea that has been
described as iconic since the design stage.” He believes that the ropeway will be a
major driver of tourist development and an expression of a far-sighted strategy for the
future. “We’re convinced that true growth can only occur in this visually and
architecturally stunning environment in conjunction if it is tied to the development of
sustainable mobility,” Leitner says.
A gondola lift which will drive tourism and help the environment
There are very few direct links from the sea to the mountains in Europe. But there will
soon be one in Montenegro. The ropeway will begin in the village of Dub within the
coastal municipality of Kotor, very near the road tunnel which connects Kotor with Tivat.
Just under four kilometers up the rope, the ropeway reaches Kuk on Mount Lovćen,
1,348 meters above sea level. This journey covers a vertical distance of no less than
1,316 meters between the bottom and top stations. The ropeway is expected to be
able to carry 1,200 passengers per hour, and the predicted number of passengers in
the first year of operation is around 400,000. The installation will have 40 cabins, each
with a capacity of ten people, and the journey time from the bottom station in Dub to
the top station in Kuk will be less than eleven minutes, which is much less time than it
currently takes by car. Equally noteworthy are the environmental benefits in an
environment as sensitive as the Lovćen National Park. Constructing the ropeway will
almost completely eliminate the use of the winding old Njeguš road, and that will
significantly reduce carbon emissions from cars and buses because it will cut down
motorized traffic to a minimum. Passengers arriving at the top station will enjoy one of
the world’s most beautiful views: the Bay of Kotor, a place which, through the
development of port infrastructure, has become a highly favored destination of
international tourists.
Stability Through Public-Private Partnership
The project involves a planned investment of €24.2 million. As in the case of the urban
ropeways in Berlin and Pisa, LEITNER is not limiting itself to providing ropeway
expertise. As part of a public-private partnership closely connected to the government
of Montenegro, LEITNER, in a project consortium with local enterprise Novi Volvox, is
responsible not only for overseeing construction, but also for maintaining and operating
the ropeway.
Zdroj https://www.leitner.com
Reportér: Ram-Brand
Kategorie: Lifts under construction and projects
Datum: 21.7.2022 17:09:16