Lift-Database » Lifts in the world
4-CLF Witow
Valley Station
Valley Station
Line
General information | |
---|---|
Place | Witów |
resort | ?? |
Region | Lesser Poland |
Country | |
Name of lift | Witow |
Type | 4-CLF |
Lift manufacturer | Doppelmayr |
Year of construction | 2006 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 836 m |
Height of mountain station | 998 m |
Vertical rise | 143 m |
Route distance | 803 m |
Horizontal length | ?? m |
Average incline | 21,4 % |
Largest incline | ?? % |
Number of pillars | 9 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2156 Pers/h |
Travel time | 5,2 min |
Driving speed line | 2,6 m/s |
electrical data | |
---|---|
Electrical control | Doppelmayr |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 146 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Seating | ?? |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 94 Stk |
Cab distance | ?? m |
Cab interval | 6,7 s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 40 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ?? |
Loading carpet | yes |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 22/11/12
PHOTOS: ??
Lift-Statistics
6210 visit(s) since 20/03/07
Last visit 09/11/24
LIFT-WORLD IDs
Lift-ID: 11080
Place-ID: 930
https://www.seilbahntechnik.net/en/lifts/11080/datas.htm
Datas: 22/11/12
PHOTOS: ??
Lift-Statistics
6210 visit(s) since 20/03/07
Last visit 09/11/24
LIFT-WORLD IDs
Lift-ID: 11080
Place-ID: 930
https://www.seilbahntechnik.net/en/lifts/11080/datas.htm