Lift-Database » Lifts in the world
4-CLF Bougnonne
General information | |
---|---|
Place | Leytron |
resort | Ovronnaz |
Region | Valais |
Country | |
Name of lift | Bougnonne |
Type | 4-CLF |
Lift manufacturer | Garaventa |
Year of construction | 2009 |
Commissioning date | 2009 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1860 m |
Height of mountain station | 2113 m |
Vertical rise | 254 m |
Route distance | 730 m |
Horizontal length | 682 m |
Average incline | 33,76 % |
Largest incline | ?? % |
Number of pillars | 7 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 4,8 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1525 Pers/h |
Travel time | 4,87 min |
Driving speed line | 2,5 m/s |
electrical data | |
---|---|
Electrical control | Frey |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 167 kW |
Drive power (Operation) | 133 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 63 Stk |
Cab distance | 21,7 m |
Cab interval | 9,45 s |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ?? |
Loading carpet | yes |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 30/01/18
PHOTOS: ??
Lift-Statistics
5139 visit(s) since 07/12/09
Last visit 22/11/24
LIFT-WORLD IDs
Lift-ID: 14426
Place-ID: 2347
https://www.seilbahntechnik.net/en/lifts/14426/datas.htm
Datas: 30/01/18
PHOTOS: ??
Lift-Statistics
5139 visit(s) since 07/12/09
Last visit 22/11/24
LIFT-WORLD IDs
Lift-ID: 14426
Place-ID: 2347
https://www.seilbahntechnik.net/en/lifts/14426/datas.htm