Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Albanas



General information  
Place Zuoz 
resort ?? 
Region Grisons 
Country   
Name of lift Albanas 
Type 4-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2014 
Commissioning date 24/12/14 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1788 m
Height of mountain station 2378 m
Vertical rise 590 m
Route distance 1953 m
Horizontal length 1846 m
Average incline 32 %
Largest incline 68 %
Number of pillars 13 Stk
Greatest spanwidth 230 m
Max ground clearance 18,8 m
Trackwidth drive 5,2 m
Trackwidth line 5,2 m
Trackwidth return 5,2 m
Angle of wrap (drive wheel) 179,2 °
Drive altitude of site 4 m
Maximum capacity 800 Pers/h
Travel time 6,97 min
Driving speed line 5 m/s
Driving speed station 1 m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) 317 kW
Drive power (Operation) 244 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type A104C 
Cab manufacturer Doppelmayr 
Cab model 4E98/B 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 46 Stk
Cab distance 90 m
Cab interval 18 s
Garage type station circulation 
Garage place valley station 
Garage direction forward 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 3956,6 m
Total weight of haul rope 24,5 t
Haul rope diameter 41 mm
Nominal strength of haul rope 1876 N/mm²
Breaking strength of rope 1114 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 4 m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system yes 
Rope position control yes 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/03/23
PHOTOS: ??

Lift-Statistics
7722 visit(s) since 06/12/14
Last visit 24/11/24

LIFT-WORLD IDs
Lift-ID: 17755
Place-ID: 2038

https://www.seilbahntechnik.net/en/lifts/17755/datas.htm