Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Crête des Bans



General information  
Place Puy-Saint-Vincent 
resort ?? 
Region Provence-Alpes-Côte d'Azur 
Country   
Name of lift Crête des Bans 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2018 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1596 m
Height of mountain station 2274 m
Vertical rise 678 m
Route distance 2253 m
Horizontal length ?? m
Average incline 31,7 %
Largest incline 65,34 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2835 Pers/h
Travel time 7 min
Driving speed line 5,25 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system SEIREL 
Power control system SEIREL 
Number of drive 2 Stk
Drive power (Start) 1060 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type A108C 
Cab manufacturer Doppelmayr 
Cab model 6E98 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 119 Stk
Cab distance 45 m
Cab interval 8,6 s
Garage type emergency rail 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 20 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Oct 11, 2025
PHOTOS: ??

Lift-Statistics
2299 visit(s) since May 16, 2020
Last visit Dec 11, 2025

LIFT-WORLD IDs
Lift-ID: 19868
Place-ID: 1178

https://www.seilbahntechnik.net/en/lifts/19868/datas.htm