Lift-Database » Lifts in the world

  6-CLD Olympique



General information  
Place Les Contamines-Montjoie 
resort Les Contamines/​Hauteluce 
Region Rhône-Alpes 
Country   
Name of lift Olympique 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2020/21 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1655 m
Height of mountain station 2115 m
Vertical rise 460 m
Route distance 1603 m
Horizontal length 1561 m
Average incline ?? %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2700 Pers/h
Travel time 5,5 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 570 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA-M 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 73 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/04/22
PHOTOS: ??