Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Galsterbergbahn

Valley Station
Valley Station

Line
Line

Line
Line

General information  
Place Pruggern 
resort Galsterbergalm 
Region Styria 
Country   
Name of lift Galsterbergbahn 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2022 
Commissioning date 05/12/22 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1142 m
Height of mountain station 1649 m
Vertical rise 507,25 m
Route distance 2334 m
Horizontal length 2245,50 m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth 600 m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1196 (1760) Pers/h
Travel time 6,30 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 794 kW
Drive power (Operation) 633 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Leitner 
Cab model Diamond C10 EVO 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 31 (45) Stk
Cab distance 180,60 m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19/01/24
PHOTOS: ??

Lift-Statistics
2196 visit(s) since 26/11/22
Last visit 27/07/24

LIFT-WORLD IDs
Lift-ID: 21934
Place-ID: 514

https://www.seilbahntechnik.net/en/lifts/21934/datas.htm