Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Ochsenkopf Nord



General information  
Place Bischofsgrün 
resort ?? 
Region Bavaria 
Country   
Name of lift Ochsenkopf Nord 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2023 
Commissioning date 2023 


Infos for handicapped persons
Sorry, no information available.

Characteristics
uphill intermediate station (access & egress

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 359 m
Route distance 2178 m
Horizontal length 2139,9 m
Average incline ?? %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 (2000) Pers/h
Travel time 6,77 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 520 kW
Drive power (Operation) 425 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model Diamond C10 EVO 
Seating ?? 
Seat heater ?? 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 40 (50) Stk
Cab distance 108 m
Cab interval 18 s
Garage type ?? 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/06/24
PHOTOS: ??

Lift-Statistics
1737 visit(s) since 18/09/23
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 23074
Place-ID: 1767

https://www.seilbahntechnik.net/en/lifts/23074/datas.htm