Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Audi line Přehradní



General information  
Place Špindlerův Mlýn 
resort Pláň 
Region Královehradecký kraj 
Country   
Name of lift Audi line Přehradní 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2026 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 698 m
Height of mountain station 1039 m
Vertical rise 341 m
Route distance 1420 m
Horizontal length 1374 m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,7 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 460 kW
Drive power (Operation) 400 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model EVO 6 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab 6 
Number of cabs 57 Stk
Cab distance 54 m
Cab interval 11 s
Garage type underground 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 44 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? CZK
Currency (Construction costs) Czech koruna 
Construction period ?? months
Seasontime ❄ winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28 oct. 2026
PHOTOS: ??

Lift-Statistics
440 visit(s) since 18 sept. 2026
Last visit 24 nov. 2026

LIFT-WORLD IDs
Lift-ID: 26950
Place-ID: 180

https://www.seilbahntechnik.net/en/lifts/26950/datas.htm