Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF König Laurin (Laurin 2)










General information  
Place Welschnofen 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift König Laurin (Laurin 2) 
Type 2-CLF 
Lift manufacturer Leitner 
Year of construction 1998 
Commissioning date ?? 
Date of closing down 30/08/20 
Date of pull down 31/08/20 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1729,6 m
Height of mountain station 2312,99 m
Vertical rise 583,3 m
Route distance 1876,91 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1008 Pers/h
Travel time ?? min
Driving speed line 2,8 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 300 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 185 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 06/06/24
PHOTOS: ??

Lift-Statistics
25651 visit(s) since 17/02/04
Last visit 16/10/24

LIFT-WORLD IDs
Lift-ID: 3786
Place-ID: 1662

https://www.seilbahntechnik.net/en/lifts/3786/datas.htm