Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Reiterjoch

Valley station
Valley station

Valley station
Valley station

Line
Line

General information  
Place Obereggen 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Reiterjoch 
Type 4-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1991 
Commissioning date ?? 
Date of closing down 2019 
Date of pull down 2019 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1875,5 m
Height of middle station(s) ?? m
Height of mountain station 2047 m
Vertical rise 171,5 m
Route distance 603,58 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2300 Pers/h
Travel time ?? min
Driving speed line 2,4 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 69 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 000 %
Drive direction left 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/02/24
PHOTOS: ??

Lift-Statistics
12946 visit(s) since 20/02/05
Last visit 28/12/24

LIFT-WORLD IDs
Lift-ID: 4027
Place-ID: 1495

https://www.seilbahntechnik.net/en/lifts/4027/datas.htm