Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  24-FUT Péclet

Line
Line

Line
Line

Line
Line

General information  
Place Val Thorens 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Péclet 
Type 24-FUT 
Lift manufacturer Creissels 
Year of construction 1990 
Commissioning date 1990 


Infos for handicapped persons
Sorry, no information available.

Characteristics
First Ever Funitel lift. Built 1990

geometric data  
Height of valley station 2239 m
Height of mountain station 2943 m
Vertical rise 704 m
Route distance 3140 m
Horizontal length 3002 m
Average incline 23 %
Largest incline 62 %
Number of pillars 11 Stk
Greatest spanwidth 750 m
Max ground clearance 50 m
Trackwidth drive ?? m
Trackwidth line 7,23 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 7,5 min
Driving speed line 6,6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 1444 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Gangloff 
Cab model ?? 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 24 
Number of cabs 38 Stk
Cab distance 240 m
Cab interval 36,36 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope 12900 m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/05/23
PHOTOS: ??

Lift-Statistics
22878 visit(s) since 07/01/03
Last visit 23/11/24

LIFT-WORLD IDs
Lift-ID: 60
Place-ID: 1234

https://www.seilbahntechnik.net/en/lifts/60/datas.htm