Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Veysonnaz










General information  
Place Veysonnaz 
resort Les 4 Vallées 
Region Valais 
Country   
Name of lift Veysonnaz 
Type 8-MGD 
Lift manufacturer Garaventa 
Year of construction 2005 
Commissioning date 22/12/05 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1370 m
Height of middle station(s) ?? m
Height of mountain station 2142 m
Vertical rise 772 m
Route distance 2591 m
Horizontal length 2462 m
Average incline 31,18 %
Largest incline 68,86 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,10 m
Trackwidth line 6,10 m
Trackwidth return 6,10 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 8,3 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Alptronic 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 1352 kW
Drive power (Operation) 887 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA III-8 LWI 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 55 Stk
Cab distance 108 m
Cab interval 18 s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 5254 m
Total weight of haul rope ?? t
Haul rope diameter 56 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope 2182 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/04/23
PHOTOS: ??

Lift-Statistics
9893 visit(s) since 18/09/05
Last visit 22/11/24

LIFT-WORLD IDs
Lift-ID: 7924
Place-ID: 2028

https://www.seilbahntechnik.net/en/lifts/7924/datas.htm